In the 1950s, Sparrows Point was the largest steel plant in the world. It closed in 2012. Now the ground is being rebuilt.
1891. Steelmaking begins at Sparrows Point, on the Patapsco River outside Baltimore, chosen for its deep water and its rail.
2012. The last steel.
About 2,000 jobs go with it, after 121 years of steel on the point.
Our part. The rooms.
Sparrow Point Foundation brings together the people doing the rebuilding, from the companies that make things to the buyers and investors behind them.
What happened at Sparrows Point happened across the industrial base. The rebuilding is the work we exist for.
35% fewer Americans work in manufacturing than at the 1979 peak, per the Bureau of Labor Statistics.
200× China’s shipbuilding capacity compared with America’s, by an Office of Naval Intelligence estimate.
Sources: U.S. Bureau of Labor Statistics, “Forty years of falling manufacturing employment” (2020) · Office of Naval Intelligence briefing slide, reported by The War Zone, “Alarming Navy Intel Slide Warns of China’s 200 Times Greater Shipbuilding Capacity” (2023)
Why now

Dual-use technology has collapsed the distance between commercial markets and national power. An AI model or a drone ships as a commercial product and gets used as a tool of national power at the same time.
The institutions that handle technology, capital, industrial capacity, and deterrence still handle them one at a time.

Industrial capacity is the piece furthest behind. Defense programs stall after the prototype, in testing and full-rate production. A capability with no line and no second source deters nobody.
Our mission
A stronger industrial base for the United States and its allies.
Sparrow Point Foundation educates and convenes toward that one end, with allies and partners including NATO, AUKUS, Japan, and Taiwan. That means the workers, the companies, the capital, and the public institutions that build and field defense and critical infrastructure capability.


How we work
Convene
Small rooms, off the record. We put practitioners who rarely share a room into one. Nothing said there is for attribution.
Solve
We source real, unclassified problems from operators and infrastructure owners, then put engineers and founders against them with mentorship and expert judging.
Publish
What comes out of the rooms will go back to the field in writing: where the supply chain is thin, where requirements and capital fail to meet, and what it takes to keep skilled people in the work. Free to read.
Supported by
All supportersThe rebuilding starts in a room
Sparrows Point took decades to build and decades to lose. Our convenings put the people rebuilding the base in one room. Next: New York, September 28–29, 2027, and Southern California, May 25–26, 2027.
See the conveningsTo support the Foundation or partner on a convening, write to [email protected].









